General Process on Most Construction Sites
First, lets consider the current flow of materials to waste on most construction sites:
- materials are delivered
- they are put in the appropriate storage area
- they are used
- waste is put in the skip
- skip is taken off site and waste is disposed of
COST EFFECTS OF THIS SYSTEM:
- time wasted when skip is needed
- staff held up waiting for clean-up if no skip is available
- materials, equipment and possibly tools discarded in a rush clean-up
- cost replacement of materials, equipment and tools
- time lost waiting for the above and the wages of the men it is holding up
- time lost on the programme for completion of the project
- costs incurred for the skip movements
- overfilled
- contaminated
- mixed
REMEMBER THAT ONCE YOUR WASTE GOES OFF SITE, IT IS NOT YOURS ANY MORE
C-Sustainable Process Flow that Adds Value Back to You:
At present your system for monitoring waste quantities is giving you results for Construction rubbish and Steel in Cubic meters and Tons respectively per month.
Average Price of Skips in South Australia
- 3 m3. = $160
- 2 m3. = $130
- 4 m3. = $220
- 6 m3. = $310
- 8 m3. = $400
Some suppliers may charge a time surcharge if the skip needs to be on site for long periods of time.
They also charge for Mixed, Contaminated, Overfull, and Overweight skips.
We will reduce skips leaving site by up to 90%.